2.503| Tanggal | Material | Kelompok | Jumlah | WO | Pekerjaan |
|---|---|---|---|---|---|
| 1/8/2023 | ARM TIE | TIANG | 1 BUAH | 08297cc7 | PENGGANTIAN ARM TIE KROPOS |
| 1/8/2023 | A3CS 70 MM | JAMPERAN | 10 METER | 08297cc7 | PENGGANTIAN ARM TIE KROPOS |
| 31/7/2023 | LTC TYPE H 150 MM | KONEKTOR | 6 BUAH | 6aa1ef72 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 2/8/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c815 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 1/8/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 444de335 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 1/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 444de335 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 1/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 444de335 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 1/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 444de335 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 1/8/2023 | TREEGUARD TYPE SPIRAL UP TO 300 | TREEGUARD | 25 METER | aee996eb | PENGAMANAN JARAK JAMPERAN FASE TERHADAP GROUND |
| 1/8/2023 | TREEGUARD TYPE ZIPPER UP TO 300 | TREEGUARD | 50 METER | aee996eb | PENGAMANAN JARAK JAMPERAN FASE TERHADAP GROUND |
| 1/8/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 13985b4d | PEMELIHARAAN / GANTI JUMPERAN SECTIONALIZER |
| 1/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 8e45d9c555 | PASANG COVER PADA SCHOON TERMINASI |
| 1/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 8e45d9c555 | PASANG COVER PADA SCHOON TERMINASI |
| 1/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c550 | PASANG COVER FCO |
| 1/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c550 | PASANG COVER FCO |
| 1/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c545 | PASANG COVER FCO |
| 1/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c545 | PASANG COVER FCO |
| 1/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c541 | PASANG COVER FCO |
| 1/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c539 | PEMASANGAN / PENGGANTIAN LA TUA / RUSAK |
| 1/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c539 | PEMASANGAN / PENGGANTIAN LA TUA / RUSAK |
| 1/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c541 | PASANG COVER FCO |
| 2/8/2023 | TREEGUARD TYPE ZIPPER UP TO 300 | TREEGUARD | 240 METER | 8e45d9c234 | PASANG COVER PADA SCHOON TERMINASI |
| 2/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 8e45d9c234 | PASANG COVER PADA SCHOON TERMINASI |
| 2/8/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c817 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 2/8/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c818 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 2/8/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c813 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 2/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | 27c0ec1d | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 2/8/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c814 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 2/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 692c126e | PASANG COVER FCO |
| 2/8/2023 | TREEGUARD TYPE SPIRAL UP TO 300 | TREEGUARD | 60 METER | 692c126e | PASANG COVER FCO |
| 2/8/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 3712caef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 3712caef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 3712caef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 3712caef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 3712caef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | A3CS 70 MM | JAMPERAN | 4 METER | 8e45d9c500 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 8e45d9c500 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 8e45d9c500 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c500 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 2/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c500 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 3/8/2023 | LTC TYPE H 150 MM | KONEKTOR | 6 BUAH | 64f19d36 | POTONG & JUMPER KEMBALI JAMPERAN |
| 3/8/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 4fadbd71 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 3/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | 79db9395 | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 7/8/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 9bfc03ca | PENGGANTIAN FCO TUA / BREAKDOWN |
| 7/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 9bfc03ca | PENGGANTIAN FCO TUA / BREAKDOWN |
| 7/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 9bfc03ca | PENGGANTIAN FCO TUA / BREAKDOWN |
| 7/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 9bfc03ca | PENGGANTIAN FCO TUA / BREAKDOWN |
| 7/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 9bfc03ca | PENGGANTIAN FCO TUA / BREAKDOWN |
| 7/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | f144cf56 | SISIP TIANG |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | c7eb766a | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | c7eb766a | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | c84f53d8 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | c84f53d8 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 845adef2 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 845adef2 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 45f4a20b | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 621f638b | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 36e0fc77 | PASANG COVER FCO |
| 8/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 36e0fc77 | PASANG COVER FCO |
| 8/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 36e0fc77 | PASANG COVER FCO |
| 8/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c203 | PASANG COVER FCO |
| 8/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c203 | PASANG COVER FCO |
| 8/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | c8b706d1 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c205 | PASANG COVER PADA SCHOON TERMINASI |
| 8/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 828d05ef | PERBAIKAN KONDUKTOR TERURAI / RANTAS DEKAT TIANG |
| 10/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | b31322ff | SISIP TIANG |
| 14/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | a96d4401 | PERBAIKAN KONDUKTOR TERURAI / RANTAS DI TENGAH GAWANG |
| 14/8/2023 | TREEGUARD TYPE SPIRAL UP TO 300 | TREEGUARD | 0,5 METER | 8e45d9c349 | PENGAMANAN JARAK JAMPERAN FASE TERHADAP GROUND |
| 14/8/2023 | A3CS 150 MM | JAMPERAN | 5,5 METER | 8e45d9c631 | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | LTC TYPE H 150 MM | KONEKTOR | 6 BUAH | 8e45d9c631 | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | A3CS 150 MM | JAMPERAN | 10 METER | 1e98b60e | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | LLC 150 - 240 MM | KONEKTOR | 6 BUAH | 1e98b60e | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | SKAT 150 MM 1 LUBANG | SCHOON / SEPATU KABEL | 6 BUAH | 1e98b60e | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 1e98b60e | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 6 BUAH | 1e98b60e | PENGGANTIAN JAMPERAN SUTM |
| 14/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 648abb08 | PASANG COVER FCO |
| 14/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 648abb08 | PASANG COVER FCO |
| 15/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 1 BUAH | b4ce1a5c | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 15/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 1 BUAH | d269168b | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 15/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 1 BUAH | e0efbca1 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 15/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 6 BUAH | 597844a4 | PEMASANGAN COVER BUSHING & LA |
| 16/8/2023 | A3CS 150 MM | JAMPERAN | 6 METER | 4495ed7f | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 16/8/2023 | LLC 150 - 240 MM | KONEKTOR | 6 BUAH | 4495ed7f | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 16/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 4495ed7f | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 16/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 4495ed7f | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 16/8/2023 | A3CS 150 MM | JAMPERAN | 6 METER | 8e45d9c535 | PERBAIKAN KONDUKTOR TERURAI / RANTAS DEKAT TIANG |
| 16/8/2023 | LTC TYPE H 150 MM | KONEKTOR | 4 BUAH | 8e45d9c535 | PERBAIKAN KONDUKTOR TERURAI / RANTAS DEKAT TIANG |
| 21/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 95c4f470 | PASANG COVER LA |
| 21/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 77ea51af | PASANG COVER PADA SCHOON TERMINASI |
| 21/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 7cb59079 | PASANG COVER PADA SCHOON TERMINASI |
| 21/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | ffc6d876 | PASANG COVER FCO |
| 21/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | ffc6d876 | PASANG COVER FCO |
| 21/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 6c8990d1 | PASANG COVER FCO |
| 21/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 6c8990d1 | PASANG COVER FCO |
| 21/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 16a2747e | PASANG COVER PADA SCHOON TERMINASI |
| 21/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | cfa13b32 | PASANG COVER PADA SCHOON TERMINASI |
| 16/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 0b891c48 | PASANG COVER FCO |
| 16/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 2a75448b | PASANG COVER PADA SCHOON TERMINASI |
| 16/8/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 5ab9392c | PEMASANGAN PERISAI PADA LBS MANUAL |
| 16/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 20dfa801 | PASANG COVER PADA SCHOON TERMINASI |
| 16/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | a634db09 | PASANG COVER FCO |
| 16/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | a634db09 | PASANG COVER FCO |
| 16/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | e87c8a2d | PASANG COVER LA |
| 16/8/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | c85adfb0 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 22/8/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | d15b9b24 | PEMASANGAN COVER TERMINASI |
| 21/8/2023 | A3CS 70 MM | JAMPERAN | 6 METER | 47e3100c | PENGGANTIAN FCO TUA / BREAKDOWN |
| 21/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 47e3100c | PENGGANTIAN FCO TUA / BREAKDOWN |
| 21/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 47e3100c | PENGGANTIAN FCO TUA / BREAKDOWN |
| 21/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 47e3100c | PENGGANTIAN FCO TUA / BREAKDOWN |
| 21/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 47e3100c | PENGGANTIAN FCO TUA / BREAKDOWN |
| 21/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | f754441e | JUMPER BARU TM5 / TM8 / TM10 |
| 22/8/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c702 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 22/8/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c703 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 22/8/2023 | PERFORMED SPIRAL GRIP 22 MM | PERFORMED & BENDING | 1 BUAH | 8e45d9c757 | PENGAMANAN GSW TUA (RANTAS) |
| 22/5/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c709 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 22/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | b322af75 | PASANG COVER FCO |
| 22/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | b322af75 | PASANG COVER FCO |
| 23/8/2023 | A3CS 70 MM | JAMPERAN | 6 METER | f09f8dae | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | f09f8dae | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | f09f8dae | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | f09f8dae | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | b65b76e3 | PASANG COVER FCO |
| 23/8/2023 | A3CS 70 MM | JAMPERAN | 6 METER | 7a6bfcef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 7a6bfcef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 7a6bfcef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 7a6bfcef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 7a6bfcef | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | 9d3230b8 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 24/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 3 BUAH | 9d3230b8 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 24/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | 9d3230b8 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 24/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 6 BUAH | 9d3230b8 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 24/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 1 BUAH | 8e45d9c804 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 29/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | f8e086eb | JUMPER BARU TM5 / TM8 / TM10 |
| 29/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 87417a19 | JUMPER FCO |
| 29/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | 09d21479 | SISIP TIANG |
| 29/8/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | e407c5e0 | SISIP TIANG |
| 30/8/2023 | ARM TIE | TIANG | 2 BUAH | 74eadac6 | PENGGANTIAN ARM TIE KROPOS |
| 30/8/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 809a355c | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 30/8/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c695 | PASANG COVER FCO |
| 30/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c695 | PASANG COVER FCO |
| 30/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 3 BUAH | d21f9279 | PENGGANTIAN JAMPERAN SUTM |
| 30/8/2023 | ALL BINDING WIRE 4 MM | PERFORMED & BENDING | 1,5 BUAH | d21f9279 | PENGGANTIAN JAMPERAN SUTM |
| 30/8/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 3 BUAH | 004/WO/SURABAYA UTARA.TANDES/V/2023 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 30/8/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 3 BUAH | 004/WO/SURABAYA UTARA.TANDES/V/2023 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 30/8/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 8e45d9c696 | PASANG COVER LA |
| 31/8/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 9780a043 | JUMPER BARU TM5 / TM8 / TM10 |
| 31/8/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | a8fff1f1 | JUMPER BARU TM5 / TM8 / TM10 |
| 4/9/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 24aafa86 | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 7/9/2023 | A3CS 150 MM | JAMPERAN | 6 METER | 9396278c | PEMASANGAN ISOLATOR BANTU PADA JAMPERAN |
| 7/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 6 BUAH | 9396278c | PEMASANGAN ISOLATOR BANTU PADA JAMPERAN |
| 7/9/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 1 BUAH | 9396278c | PEMASANGAN ISOLATOR BANTU PADA JAMPERAN |
| 11/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 8e45d9c684 | PASANG COVER LA |
| 11/9/2023 | A3CS 150 MM | JAMPERAN | 1 METER | d5cbd4d5 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 11/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | d5cbd4d5 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 11/9/2023 | JOINT SLEEVE NONTENSION 150 MM | KONEKTOR | 1 BUAH | d5cbd4d5 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 11/9/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c674 | PEMASANGAN COVER BUSHING & LA |
| 11/9/2023 | TREEGUARD TYPE ZIPPER UP TO 240 | TREEGUARD | 0,75 METER | 8e45d9c675 | PENGAMANAN JARAK JAMPERAN FASE TERHADAP GROUND |
| 12/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 2 BUAH | 8e45d9c438 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 12/9/2023 | ALL BINDING WIRE 4 MM | PERFORMED & BENDING | 2 BUAH | 8e45d9c438 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 12/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 51a48af4 | POTONG & JUMPER KEMBALI JAMPERAN |
| 12/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 5 BUAH | 004d3852 | JUMPER BARU TM5 / TM8 / TM10 |
| 12/9/2023 | JOINT SLEEVE FULL TENSION 150 MM | KONEKTOR | 1 BUAH | 004d3852 | JUMPER BARU TM5 / TM8 / TM10 |
| 12/9/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | 8e45d9c490 | PERBAIKAN POSISI CROSS ARM |
| 13/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 44f854e5 | PASANG COVER LA |
| 13/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | c007a69e | PASANG COVER LA |
| 13/9/2023 | PERISAI DS OUTDOOR POLYMER JS 385 | COVER & PERISAI | 3 PASANG | 8e45d9c479 | PEMASANGAN PERISAI PADA DS OUT DOOR |
| 13/9/2023 | A3CS 150 MM | JAMPERAN | 6 METER | ad398009 | PENGGANTIAN JAMPERAN SUTM |
| 13/9/2023 | LLC 150 - 240 MM | KONEKTOR | 5 BUAH | ad398009 | PENGGANTIAN JAMPERAN SUTM |
| 13/9/2023 | JOINT SLEEVE NONTENSION 150 MM | KONEKTOR | 1 BUAH | ad398009 | PENGGANTIAN JAMPERAN SUTM |
| 13/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 485de6a2 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 13/9/2023 | JOINT SLEEVE NONTENSION 150 MM | KONEKTOR | 3 BUAH | 485de6a2 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 13/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 3 BUAH | 485de6a2 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 14/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 0728d1d0 | JUMPER FCO |
| 14/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 2734ff20 | JUMPER FCO |
| 18/9/2023 | TREEGUARD TYPE SPIRAL UP TO 300 | TREEGUARD | 0,25 METER | 8e45d9c575 | PENGAMANAN JARAK JAMPERAN ANTAR FASE |
| 18/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 8e45d9c590 | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 25d2f58d | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 25d2f58d | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 40ad88f7 | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 99d7fce6 | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 99d7fce6 | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 9c56f58c | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 9c56f58c | PASANG COVER PADA SCHOON TERMINASI |
| 18/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | 83e3d507 | PERBAIKAN KONDUKTOR TERURAI / RANTAS DI TENGAH GAWANG |
| 18/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 894dc9b1 | JUMPER FCO |
| 18/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 3 BUAH | 0da2d7a8 | SISIP TIANG |
| 18/9/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | 0da2d7a8 | SISIP TIANG |
| 19/9/2023 | ALL BINDING WIRE 4 MM | PERFORMED & BENDING | 4,5 BUAH | 5aeab996 | JUMPER FCO |
| 19/9/2023 | TREEGUARD TYPE ZIPPER UP TO 300 | TREEGUARD | 10 METER | 3ab8990a | PASANG TREEGUARD |
| 20/9/2023 | A3CS 70 MM | JAMPERAN | 6 METER | 24a2c1ff | PENGGANTIAN FCO TUA / BREAKDOWN |
| 20/9/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 24a2c1ff | PENGGANTIAN FCO TUA / BREAKDOWN |
| 20/9/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 24a2c1ff | PENGGANTIAN FCO TUA / BREAKDOWN |
| 20/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 24a2c1ff | PENGGANTIAN FCO TUA / BREAKDOWN |
| 20/9/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 24a2c1ff | PENGGANTIAN FCO TUA / BREAKDOWN |
| 20/9/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | 61a53681 | PENGGANTIAN CROSS ARM KROPOS |
| 20/9/2023 | TREEGUARD TYPE ZIPPER UP TO 300 | TREEGUARD | 4 METER | c97749bd | PASANG TREEGUARD |
| 20/9/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c307 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 20/9/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c572 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 20/9/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 6e6d261a | PASANG COVER PADA SCHOON TERMINASI |
| 20/9/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 3 BUAH | 8e45d9c542 | PENGGANTIAN CROSS ARM KROPOS |
| 21/9/2023 | A3CS 150 MM | JAMPERAN | 6 METER | 998da493 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 21/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 998da493 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 21/9/2023 | JOINT SLEEVE NONTENSION 150 MM | KONEKTOR | 3 BUAH | 998da493 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 21/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 3 BUAH | 998da493 | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 22/9/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | 080b5de3 | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 22/9/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 3 BUAH | 4f15ba80 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 22/9/2023 | PERFORMED TOP TIES 240 MM | PERFORMED & BENDING | 3 BUAH | 4f15ba80 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 25/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 3 BUAH | 0c17bb9f | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 25/9/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 2e5b140d | PEMASANGAN PERISAI PADA LBS MANUAL |
| 25/9/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 56af8489 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 25/9/2023 | LTC TYPE H 150 MM | KONEKTOR | 6 BUAH | 4548ca96 | POTONG & JUMPER KEMBALI JAMPERAN |
| 2/10/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 2/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 2/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 2/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 2/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 2/10/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 2 BUAH | 8e45d9c462 | PENGGANTIAN / HAR JAMPERAN FCO |
| 3/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c777 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 3/10/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8279e87e | JUMPER BARU TM11 / MVTIC3 / MVTIC5 |
| 3/10/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | da15ce29 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 5/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | bc3894ae | POTONG & JUMPER KEMBALI JAMPERAN (LOKALISIR DAERAH PADAM) |
| 5/10/2023 | A3CS 70 MM | JAMPERAN | 4 METER | 8e45d9c272 | PEMASANGAN LA JTM |
| 5/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 8e45d9c272 | PEMASANGAN LA JTM |
| 5/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 8e45d9c272 | PEMASANGAN LA JTM |
| 5/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c272 | PEMASANGAN LA JTM |
| 5/10/2023 | COVER LA | COVER & PERISAI | 3 BUAH | 8e45d9c272 | PEMASANGAN LA JTM |
| 5/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 3 BUAH | 2585c62b | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 9/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 8e45d9c774 | PENGGANTIAN ISOLATOR EKS 6 KV / TUA / FLASH OVER / GUPIL / PECAH |
| 9/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 8b6869db | PENGGANTIAN ISOLATOR EKS 6 KV / TUA / FLASH OVER / GUPIL / PECAH |
| 10/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | b4e251de | JUMPER FCO |
| 10/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | b4e251de | JUMPER FCO |
| 9/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 4888db03 | PENGGANTIAN ISOLATOR EKS 6 KV / TUA / FLASH OVER / GUPIL / PECAH |
| 9/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 9984f7ae | PENGGANTIAN ISOLATOR EKS 6 KV / TUA / FLASH OVER / GUPIL / PECAH |
| 9/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 6cd2daee | PENGGANTIAN ISOLATOR EKS 6 KV / TUA / FLASH OVER / GUPIL / PECAH |
| 11/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 6 BUAH | ae51d743 | PENGAMANAN JARAK JAMPERAN FASE TERHADAP GROUND |
| 12/10/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c606 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 12/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c796 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 12/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c809 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 12/10/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 379c324d | PEMASANGAN PERISAI PADA LBS MANUAL |
| 12/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 1cc65bde | JUMPER FCO |
| 16/10/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 0ecb30b7 | PASANG COVER PADA SCHOON TERMINASI |
| 16/10/2023 | COVER FCO | COVER & PERISAI | 6 BUAH | 8e45d9c395 | PEMASANGAN COVER BUSHING & LA |
| 17/10/2023 | PERISAI LBS JS 400 | COVER & PERISAI | 3 PASANG | 8e45d9c771 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 17/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c772 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 17/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | a6a98745 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 17/10/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | fae85212 | PASANG COVER PADA SCHOON TERMINASI |
| 17/10/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 78d032a9 | PASANG COVER PADA SCHOON TERMINASI |
| 16/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 3 BUAH | 90357fcf | PENGGANTIAN CROSS ARM KROPOS |
| 16/10/2023 | A3CS 70 MM | JAMPERAN | 6 METER | 8d7b79f4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 16/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 8d7b79f4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 16/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8d7b79f4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 16/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8d7b79f4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 16/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 8d7b79f4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 8043edc0 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | 8043edc0 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | ef2a4694 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | ef2a4694 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | ccf4da55 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | ccf4da55 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 7e56be84 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 177c2624 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | 177c2624 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | 7e56be84 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | afc6d5a2 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 40 CM | TREEGUARD | 1 BUAH | afc6d5a2 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 18/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | ca00fe72 | PASANG COVER FCO |
| 18/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | ca00fe72 | PASANG COVER FCO |
| 17/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 93da99bf | JUMPER FCO |
| 18/10/2023 | LTC TYPE H 240 MM | KONEKTOR | 3 BUAH | 6bbcb34d | PEMELIHARAAN / GANTI JUMPERAN SECTIONALIZER |
| 18/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 3 BUAH | 608cbc26 | PENGGANTIAN CROSS ARM KROPOS |
| 23/10/2023 | PERISAI LBS JS 380 | COVER & PERISAI | 3 PASANG | 8e45d9c599 | PEMASANGAN PERISAI PADA LBS MANUAL |
| 23/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 8e45d9c600 | PASANG COVER FCO |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 8e45d9c600 | PASANG COVER FCO |
| 23/10/2023 | COVER BUSHING/TERMINASI | COVER & PERISAI | 3 BUAH | 8e45d9c601 | PASANG COVER PADA SCHOON TERMINASI |
| 23/10/2023 | LLC 150 - 240 MM | KONEKTOR | 3 BUAH | a1012a0b | JUMPER BARU TM5 / TM8 / TM10 |
| 23/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | 01a5a151 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 1 BUAH | 01a5a151 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 1 BUAH | f1c04d08 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 23/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | f1c04d08 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 24/10/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 87fbd296 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 87fbd296 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 87fbd296 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 87fbd296 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 87fbd296 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | A3CS 70 MM | JAMPERAN | 5 METER | 89f82359 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | 89f82359 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | 89f82359 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 89f82359 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 89f82359 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | A3CS 70 MM | JAMPERAN | 6 METER | bd9c90e4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | LLC 70 - 150 MM | KONEKTOR | 3 BUAH | bd9c90e4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | SKAT 70 MM 1 LUBANG | SCHOON / SEPATU KABEL | 3 BUAH | bd9c90e4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | bd9c90e4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 24/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | bd9c90e4 | PENGGANTIAN FCO TUA / BREAKDOWN |
| 23/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | 1a159e6b | PASANG COVER FCO |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | 1a159e6b | PASANG COVER FCO |
| 23/10/2023 | PERFORMED TOP TIES 150 MM | PERFORMED & BENDING | 1 BUAH | a0435c74 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 60 CM | TREEGUARD | 1 BUAH | a0435c74 | PERBAIKAN / PENGGANTIAN BINDING / NGECER DENGAN PERFORMED |
| 23/10/2023 | COVER FCO | COVER & PERISAI | 3 BUAH | f6fefe04 | PASANG COVER FCO |
| 23/10/2023 | INSULATING PIPE TYPE SPIRAL (HITAM) 15 CM | TREEGUARD | 3 BUAH | f6fefe04 | PASANG COVER FCO |